Our congregation (and contractors) have been busy at the new church! We have given the sanctuary a facelift with new paint, lighting, and our altar area. Check out the before and after photos. In addition to these updates, we’ve also completed these:

  • Tore out the curved walls in the front of the sanctuary.
  • Removed the pink curtains and wall in the front of the sanctuary.
  • Reversed the double doors that exit to the outside of the sanctuary.
  • The Hallway bathroom was renovated to be more accessible.
  • The inside was painted in three days flat.
  • Internet, Security Camera’s, and Alarm are in place and functional.
  • Fellowship Room ceiling has been patched up.
  • Children’s area has been setup with a changing table
  • Parking lot along with four bumper blocks
  • Door closure to the garage area

Check back for additional progress reports.